South Lakes - Shopping centre - kerbing - patching

The first two photos below show a drive-thru to a fast food restaurant in South Lakes. Part of the concrete kerb had broken away and has been removed and the sealed surface broke through creating a hazardous large pothole. The pothole edges were trimmed straight, loose adjacent asphalt surface was removed before sealing with a bitumen tack and 7mm thick layer of 10mm granite black hotmix/asphalt. The following photos show the completed repair work after the section of missing

Gooseberry Hill - driveway - crossover - construction

The first four photos show the original driveway to this secluded residence in the hills suburb of Gooseberry Hill. A well worn washed out hardstand driveway in need of attention. The following five photos show the hardstand surface after we scraped the existing driveway, spread, levelled, compacted and waterbound a layer of roadbase. This driveway is ready for sealing once the leaves and vegetation which had fallen over night are swept off. The four photos below show the com