Victoria Park - carpark - church - resurfacing

Below are pictures of an old church carpark in need of resurfacing. The photos below show the surface once our crew had finished. The driveways and carbays were swept clean, edges trimmed back to tie in flush, potholes pre-filled and compacted. Once the preliminary works had been completed the area was tacked with a bitumen emulsion and resurfaced with a 25mm thick layer of 7mm granite black hotmix/asphalt. Sand was sprinkled on the surface to allow for immediate use and the

Peppermint Grove - crossover - patching - linemarking

Below are before and after photos of an entrance to a business premises on Stirling Highway. Traffic entering the property had the problem of "bottoming out" on a high section of the crossover causing damage to vehicles and the crossover. The high section of the crossover was cut out, excess roadbase removed with our Bobcat, the surface recompacted, waterbound and sealed with a bitumen tack emulsion and 25mm thick layer of 10mm granite black hotmix/asphalt. Sand was sprinkled

Perth - linemarking - signage - commercial asphalt carpark

Below are just some examples of linemarking and signage which we have completed for a Perth Hospital carpark. Please don't hesitate to call if we can assist you with linemarking or traffic control information signs. #perth #carpark #signs #linemarking #asphalt #traffic

Armadale - carpark - bollards - wheelstops

This Armadale carpark was being prepared to be secured with perimeter fencing, sliding security gate with bollards, new line marking and wheelstops. Only minor patching was required with asphalt/hotmix/bitumen adjacent to the concrete footing making ready for the new sliding electric security gates. #bollards #wheelstops #patch #asphalt #hotmix #bitumen #linemarking

High Wycombe - one year old - resurface carpark - linemarking

This carpark which is worn and full of potholes was resurface with a layer of black/asphalt/hotmix/bitumen. The carbays were re-marked with linemarking paint and note how the surface has lightened up after 12 months of use. #carpark #resurface #linemarking # asphalt # hotmix # bitumen