Carmel - culvert drain - hardstand crossover

The first 3 photos below show part of the verge prior to any of our work taking place.


Our client requires a wide crossover on this semi-rural / industrial property to allow access for large trucks and machinery.


The existing culvert trench has been excavated and prepared for the installation of new 300mm Ø culvert pipes and headwalls to match.


Following the installation of the new culvert pipework the trench was filled and compacted.


A 150mm thick layer of gravel/ferricrete was spread, compacted and waterbound to form a new hardstand crossover.


The surface will harden when it dries allowing for immediate heavy traffic use.