The existing surface along the edge of this concrete carpark had sunken and cracked causing a trip hazard for pedestrians. The damaged area was sawcut and removed. New black asphalt / hotmix was installed flush with the surrounding surfaces. The job was completed in a few hours and ready to be used immediately.
Peter
Comments