After extensive repairs to the concrete driveway and brickpaved footpath, the existing asphalt crossover was left damaged and worn.
The damaged area was sawcut, removed and disposed off site.
Existing roadbase was releveled, compacted and water bound to prepare for hotmix.
7mm black hotmix was laid to seal the prepared roadbase flush with all surrounding surfaces.
Peter
Comments