The owners of this Perth coastal suburb of Hillarys contacted us to repair the excavation in the driveway as shown below which was caused by a burst waterpipe.
Following the repair work of the waterpipe by the local plumber we installed, compacted and waterbound a 100mm thick layer of roadbase/gravel.
The patch was then sealed with 10mm granite black hotmix/asphalt @ 40mm thickness and compacted flush with a vibrating roller.
The marks around the patch are just water from the vibrating roller which will evaporate.
Comentários