• Peter

Middle Swan - excavation - repair

After a burst water pipe was repaired by the Plumber we were called in to excavate and saw cut the damaged section of the driveway.


Add a compacted and waterbind roadbase/gravel/limestone base.


Finished off with a 40mm black asphalt/hotmix/bitumen seal on a tack coated base surface which is ready of immediate use after a sprinkling of sand.


#MiddleSwan #Perthhills #repair #blackasphalt


30 Oxford Ct, Maida Vale WA 6057, Australia

©2020 by Allied Bitumen Contractors.