• Peter

Middle Swan - pothole repairs - commercial

The driveway and crossover of this commercial property in Middle Swan was in urgent need of repair as it was covered with potholes and worn out patches creating a hazard.The patches were swept clean



The Patches were swept clean, tacked with a bitumen emulsion and filled with a layer of 7mm granite black asphalt/hotmix - overlapping the edges to ensure a good seal.


Even though the patches might be unsightly at first, the colour will lighten up and blend in over time.


This cost effective way of repair will extend the life of the surface by many years.


#commercial #hotmix #asphalt #middleswan #driveway #potholes #repairs

30 Oxford Ct, Maida Vale WA 6057, Australia

©2020 by Allied Bitumen Contractors.