top of page
  • Peter

Victoria Park - carpark - church - resurfacing

Updated: May 17, 2021


Below are pictures of an old church carpark in need of resurfacing.




The photos below show the surface once our crew had finished.


The driveways and carbays were swept clean, edges trimmed back to tie in flush, potholes pre-filled and compacted.


Once the preliminary works had been completed the area was tacked with a bitumen emulsion and resurfaced with a 25mm thick layer of 7mm granite black hotmix/asphalt.


Sand was sprinkled on the surface to allow for immediate use and the reduction of scuffing in turning areas.


Linemarking was completed a few days later.


8 views0 comments
Post: Blog2_Post
bottom of page