top of page
  • Peter

West Swan - commercial - traffic island modification

Updated: Jun 12, 2023


Below are 4 photos of a traffic island prior to our company removing a large section to reduce the size to allow for easier traffic access.







The following 4 photos show various stages of work being carried out.


The first photo shows the area with part of the traffic island excavated and removed and the excavation filled with 100mm roadbase.


The following 3 photos show the area levelled, compacted, waterbound and sealed with a bitumen tack and 25mm thick layer of 7mm granite black hotmix.


The area has been marked out for concrete kerb.




The final 3 photos show the completed modification to the traffic island with the concrete kerb now installed and backfilled with garden mulch.


This modification has allowed customers to park up out of the way of traffic while they wait for their coffee order.

6 views0 comments
Post: Blog2_Post
bottom of page