Peter
Apr 25, 20201 min
This commercial property had a concrete hardstand area at the rear of the premises that was not level with the bitumen lane way.
We saw cut the edge of the lane and formed a ramp out of asphalt / bitumen.
The rear of this property is now accessible to all forms of traffic and has a smooth transition from one surface to the next.