Peter

Apr 5, 20201 min

Crossover Construction - Perth Hills - Darlington

This crossover construction began on an existing, badly damaged, gravel hardstand surface.
 

 
The surface was prepared with new gravel/ferricrete roadbase to re-level and create a clean, flat surface for the bitumen seal.
 

 
Red hotmix / asphalt / bitumen was laid to seal the crossover with a small water diversion hump installed along one side.
 

 
The finished product looks amazing and the customer is very happy with the outcome.

#Crossover #Construction

40
0