Peter

Apr 5, 20201 min

Rear laneway bitumen patch - Scarborough Perth

This storage area behind a commerical property in Scarborough was holding water, making it useless to the tenants.
 

 
After a new soakwell was installed we were contracted to relevel the area with roadbase, creating fall to the new soakwell and seal with black hotmix/asphalt.
 

 
The area was left clean and ready for the tenant to use immediately.

#Rear #laneway #bitumen #patch

    70
    0