This industrial property in Bibra Lake had a number of deep subsidences in their driveway and loading dock area.
The areas were saw cut, removed, prefilled, tacked with a bitumen emulsion and patched with 14mm granite black hotmix/asphalt @ thicknesses ranging from 50mm to 100mm.
Σχόλια