• Peter

Parking Bays - Perth CBD

The existing parking area at the rear of this commercial property was badly worn, cracked and damaged. All loose material was removed off site, the surface repaired and levelled before black hotmix / asphalt / bitumen was laid. The area was ready for parking immediately.













#commercial #carpark #asphalt

30 Oxford Ct, Maida Vale WA 6057, Australia

©2020 by Allied Bitumen Contractors.