South Perth - crossover temporary repair

Below are 2 photos of a badly damaged concrete crossover to a vacant block of land.


The local council asked the owner to remove the broken sections of concrete as a safety precaution prior to the commencement of building works.



Below is a photo of the damaged crossover with the concrete sections removed.


We have installed roadbase to fill the excavations level and compacted and waterbound to form a hardstand surface. This will ensure that once building work starts and heavy trucks start using the entrance that no sections of broken concrete move in such a way that it could cause a hazzard.