• Peter

Osborne Park - carpark - commercial premises - ramp

The photo below shows a completed ramp joining the concrete carpark onto the driveway.


Part of the Colourbond fence was removed and gates were installed.


We removed bollards, concrete kerb and a hump along the edge of the concrete, sawcut edges, prepared the base and sealed with a bitumen tack and 7mm granite black 50mm thick hotmix/asphalt forming a flush ramp to all adjoining surfaces allowing traffic flow to the newly opened carpark.


Sand was sprinkled on the newly laid surface to allow for immediate traffic flow.


#ramp #bollards #hotmix #bitumen #asphalt #sawcut #osbornepark #roadbase

30 Oxford Ct, Maida Vale WA 6057, Australia

©2020 by Allied Bitumen Contractors.