top of page
Peter

Wattle Grove - patching

Below is an example of the sort of repair work our Company undertake.


The excavation was cut square, gravel base installed, compacted and waterbound.


Upon the basework drying out we sealed the excavation with a tack bitumen emulsion and 50mm thick layer of 10mm granite black hotmix/asphalt.



2 views0 comments

Recent Posts

See All

Comments


Post: Blog2_Post
bottom of page